Delayed Failure of the Brumadinho Tailings Dam
2021 - 2023
The 2019 Feijão dam failure in Brumadinho, Brazil, claimed 270 lives and caused enormous environmental damage. A special feature of this failure was that it took place three years after the tailings disposal was terminated, which should have allowed sufficient time for the material to consolidate and increase its strength. Here we propose a basic physical mechanism of a delayed slip surface growth along weak layers of fine tailings within the dam body. Using accurate numerical modelling of all stages of the evolution of the Feijão dam, we show how this growth was preconditioned by dam construction and tailings discharge history and further driven by creep deformation during the post-closing stage, until the slip surfaces reached their critical length, resulting in their unstable propagation and the rapid collapse of the entire dam. Main factors controlling the time of failure have been identified, facilitating future risk assessment for decommissioned tailings dams.

Researchers
Prof. Dr. Alexander M. Puzrin
Dr. Fangyuan Zhu
Dr. Wangcheng Zhang
Publications
Zhu F., Zhang W. and Puzrin A.M. (2023) “The slip surface mechanism of delayed failure of the Brumadinho tailings dam in 2019”, Communications of Earth and Environment.
Contact
Head of Institute for Geotechnical Engineering
- Location location_onHIL C 15.1
- Phone phone+41 44 633 21 80
- Emailemailalexander.puzrin@igt.baug.ethz.ch
- contactsvCard Download
Institut für Geotechnik
Stefano-Franscini-Platz 5
8093
Zürich
Switzerland